The project section includes the connection line between the tunnel and the entrance. The original simulation system lacks clarity, but rerouting the entire line will affect traffic. The transformation adopts the method of reusing coaxial lines.
Project Overview
HD-SDI mini high-speed domes are used at the tunnel entrance and road sections, and HD-SDI domes are used at fixed points in the tunnel; the existing analog front-end is connected to the network platform through encoders; the monitoring center retains the original cabinet location, and adds an NVR and control keyboard.
construction arrangements
Construction will be carried out in batches according to tunnel entrances and tunnel sections, and the replacement of poles and equipment will be completed during low-traffic periods at night; the coaxial lines will be tested for continuity and attenuation first, and then the front end will be installed.
Operation effect
After the transformation, the screen was upgraded to 1080P, the event review delay was low, and the original lines continued to be used, reducing the workload of civil engineering and wiring.